FOR BUYERSGET PARTS

Two lanes. One door.

Parts inside the catalog envelope get a price in minutes and a date backed by money. Everything else gets a human answer inside two business days — a real quote and a committed date when the answer is yes, and a straight no when it is not. Both lanes are Praetore: we are the manufacturer of record on both, not a marketplace passing you along — one counterparty, the same documentation, the same drawing. You do not have to know which lane your part is in. Sorting that is our job, not your homework.

Two service levels, not a pass and a fail.

What separates the lanes is how much of the work we have verified in advance — not how much we want the job. A catalog part runs inside a design space we have already engineered against, so a machine can price it and a network can promise it. A sourcing part runs on judgment, a phone call, and a person who has to go and look. Both ship with certs. Both are our name on the box.

Lane 01

The Catalog

In-envelope work. Priced by the model, dated against open capacity across the network, backed by automatic credits if we miss. Reroutable by construction — which is the only honest reason a date can carry money.

Lane 02

Sourcing

Everything else. Quoted by a person inside two business days, brokered through shops we have vetted, dated honestly and scheduled by hand. This is the business Praetore already runs, kept and promoted — not a consolation prize.

Catalog lane compared with Sourcing lane, attribute by attribute
AttributeCatalog laneSourcing lane
PriceInstant, computed from your modelHuman-quoted, response in ≤ 2 business days
Ship dateGuaranteed — a term of the orderCommitted — scheduled by a person
Late creditsAutomatic, applied to the invoiceNot offered Note 1: why the Sourcing lane carries no automatic credit1
Processes3-axis milling, up to 2 setupsTurning, 5-axis, EDM, grinding, weldments, assemblies
MaterialsThe fixed stock library. Customer-supplied accepted with a cert, flagged.Beyond the library — sourced for you or customer-supplied, with certs either way.
Quantity1–500 instant · 501–5,000 engineered in 2 daysPer quote
DocumentationCerts + dimensional report · FAI on requestCerts + dimensional report · FAI on request
ReorderInstant at any prior quantity, loyalty pricingRe-quoted
Your counterpartyPraetorePraetore

Note 11The automatic-credit instrument is written against the Catalog envelope only. The reason is underwriting, not enthusiasm, and it is spelled out in the Sourcing section. The credit schedule, its caps, and the full list of what voids or tolls the clock live on the Guarantee page.

The envelope, stated like a spec sheet.

This is the entire design space the instant lane covers. It is deliberately narrow, and published in full, because a price in minutes is only honest for work that has been verified in advance and a date is only guaranteeable for work that can move to another machine on Tuesday. The constraint is not the fine print. It is the product.

Maximum part envelope, version 1A three-view orthographic drawing of the maximum part envelope: twelve inches by eight inches by four inches, with a ghosted part inside. Notes call out the minimum part size of 0.375 by 0.375 by 0.125 inches, a minimum wall of 0.030 inches in metals and 0.060 in plastics, a minimum internal corner radius of 0.031 inches, a maximum of two setups, and three-axis vertical milling.123TOPFRONTRIGHT SIDENOTES1MIN PART0.375 × 0.375 × 0.1252MIN WALL0.030 METALS · 0.060 PLASTICS3MIN INTERNAL R0.031 — ACCEPTS 1/16 END MILLSETUPSMAX 2 — OP1 / OP2 FLIPPROCESS3-AXIS VERTICAL MILLINGTHIRD-ANGLE PROJECTION · ENV-1.0
Catalog-lane design envelope, version 1. Every limit shown is a published constraint of the current envelope, not a measured capability. Work outside it is not refused — it routes to the Sourcing lane with a human-committed date.

B.1Processes

In the catalog

  • 3-axis vertical milling
  • Up to 2 setups per part (op1 / op2 flip)
  • Drilling
  • Tapping — form and cut
  • Reaming
  • Counterboring
  • Chamfering

Not in v1 — routes to Sourcing

  • Turning — first in line
  • 3+2 positional
  • 5-axis simultaneous
  • Wire and sinker EDM
  • Grinding
  • Welding

Each of these is a future container size, added when verification scales to it and not before. Turning is first in line. We are not going to put a date on it here — it ships when the verification does.

B.2Part geometry

Geometric limits of the catalog envelope, with the reason for each
ParameterLimitWhy the limit exists
Max part size12.000 × 8.000 × 4.000"Fits every network machine with fixture clearance; one stock library
Min part size0.375 × 0.375 × 0.125"Below this, workholding stops being standard
Min wall0.030" metals · 0.060" plasticsChatter and verification risk
Min internal corner radius0.031"Tool library floor — accepts a 1/16" end mill
Max hole depth : diameter8:1 standard · 12:1 flaggedDrill wander, simulation confidence
Max pocket depth : tool dia.4:1 standard · 6:1 flaggedDeflection modeling limits
ThreadsUNC / UNF #2–3/4" · M2–M20 · 2B / 6HStandard tap library
Undercuts, T-slots, dovetailsFlaggedSpecial tooling path

Flagged does not mean no

When a feature is flagged, the automated quote pauses and an engineer dispositions it within four business hours. You get either a compliant redesign where one exists — “open that internal corner to R0.031 and it prices instantly” — or a Sourcing-lane quote where one does not. What you never get is a silent rejection or a form that says your file could not be processed.

B.3Material library

Aluminum
6061-T6 · 7075-T651
Stainless
303 · 304 · 17-4PH (Cond A, H900)
Steel
1018 · 4140 (annealed, pre-hard)
Brass
360
Titanium
6Al-4V — flagged pricing tier
Plastics
Delrin 150 · UHMW · PEEK (flagged) · polycarbonate

Stock is held as plate and bar on a defined thickness ladder, 0.250 to 4.500 inches. Customer-supplied material is accepted with a cert — it is flagged, and it voids the batching discount, because a lot we did not buy cannot ride in somebody else’s buy. Anything not on this list goes to human review.

The library grows by tested addition: a material enters when it has proven feeds and speeds, a stock supply, and at least one committed recurring buyer. That is the whole list, and it is short on purpose. A shared ladder is what lets one material buy and one fixture load cover parts from three different customers — and about a third of that saving comes back to your price.

B.4Tolerance classes

Priced, not negotiated. A print with mixed exotic callouts is re-quoted per feature class, mechanically.

Tolerance classes, their limits, and which lane they price in
ClassLinearHolesFlatnessHow it prices
Standard±0.005"±0.003"0.005" / inDefault · instant price
Precision±0.002"±0.001"0.002" / inInstant price · premium
Tight±0.0005–0.001"to ±0.0005"Per featureFlagged · CMM-verified shop tier

GD&T accepted. Position and profile callouts beyond the Precision class auto-flag. Tolerances here are a menu, not a conversation — which is exactly why the menu is published.

B.5Finishes

Surface texture, material removal required — MILLMILLAs-machined, default · Ra 125Surface texture, material removal required — MILLMILLAs-machined, premium · Ra 63

ROUGHNESS IN µIN Ra · MATERIAL REMOVAL REQUIRED

The fixed finish menu
FinishNotes
As-machined125 µin Ra default · 63 µin Ra premium
Bead blastUniform matte, standard media
Anodize Type IIClear and black · other colors flagged
Anodize Type IIIHardcoat
PassivationStainless, per the material spec
Zinc plateStandard trivalent
Black oxideSteel
Powder coatStandard RAL subset

Chem film, nickel, and anything not on this menu is flagged and partner-routed. It adds days, and we state the days before you order rather than after we miss.

B.6Quantities and repeats

1 – 500 pcs
Instant lane. Price and date options on the spot.
501 – 5,000 pcs
Engineered quote, back in 2 business days.
Over 5,000 pcs
A program conversation, because scheduling a run that size is one.
Reorder of an existing packet
Always instant, at any prior quantity, with loyalty pricing.

A reorder is instant because the packet already exists. That is not a discount invented for a marketing page — it is engineering we already did, and we are not going to charge you for it twice.

Outside the catalog? Send it anyway.

The envelope describes what a machine can price. It does not describe what we can make. Out-of-envelope work enters the Sourcing lane: reviewed by a person, quoted with a real committed date, and run through shops we have vetted — with the same documentation package the Catalog lane ships. Nothing is refused at the door, and nothing is quietly dropped either.

What the Sourcing lane covers

  • Turned parts and mill-turn work
  • 5-axis and 3+2 geometry
  • Weldments and fabrications
  • Assemblies and kitted builds
  • Castings and forgings, machined
  • Envelopes larger than the catalog box
  • Materials outside the stock library
  • Medical, energy and defense components beyond the envelope

If you want the same list read back through your industry — aerospace, medical, energy, robotics, semiconductor — it is broken out on Industries.

What we commit to

Response
An answer within two business days — an honest yes or no, with a timeline attached to the yes.
The date
A committed ship date, scheduled by a person against a real shop calendar. If it moves, you hear it from us first.
The paperwork
Material certs and a dimensional report, same as the Catalog lane. FAI to AS9102 on request.
Accountability
Praetore is your only counterparty in both lanes — one PO, one invoice, one company answering the phone. You never mediate between us and a shop.

What the Sourcing lane does not carry, and why

Sourcing dates are committed. They do not carry the automatic-credit instrument.

A credit schedule is an insurance product, and writing one takes a measured envelope: the same standard, the same packet, the same fixture family, job after job. Inside the Catalog that measurement is the whole design. On a one-off weldment it does not exist, and a credit you have to argue about is not a credit.

One boundary that demand does not move

Components for regulated products: yes, in either lane, all day. Finished regulated devices — anything gated on ISO 13485 and FDA registration, or an equivalent certification for the end product — no, and not because of volume. That is a deliberate certification decision, not a capacity one, and no amount of inbound demand changes it. When it changes, it will change because we hold the certification, and we will say so in exactly those words.

You do not have to decide which lane your part belongs in. Send the model and the quantity; the DFM runs, the lane gets assigned, and you get either a price on the spot or a person inside two business days.

Upload a Part

Tell us what you wish were instant, and watch the envelope grow.

Every Sourcing job is logged with its feature class. That log is not a graveyard of things we said no to — it is the expansion roadmap, and it is the only input that widens the Catalog. Work that shows up often enough, and that we can verify, graduates into the instant lane. Which means the fastest way to make your part instant is to send it to us while it is still slow.

How Sourcing demand widens the Catalog envelopeFour stations left to right. One: every out-of-envelope job is logged by feature class. Two: a feature class must exceed five percent of inbound demand for two consecutive quarters. Three: a verification method — simulation, tooling, and a stock and fixture plan — must exist. Four: the envelope is revised and signed off by engineering and operations. A heavy line then returns from the revision back to the Catalog lane, where that work is now instantly priced and guaranteed.01SOURCING LOGEVERY OUT-OF-ENVELOPE JOB,LOGGED BY FEATURE CLASS02DEMAND THRESHOLD> 5% OF INBOUND DEMAND,TWO CONSECUTIVE QUARTERS03VERIFICATION METHODSIMULATION · TOOLING ·STOCK AND FIXTURE PLAN04ENVELOPE REVISIONENV-1.0 → ENV-1.1,SIGNED BY ENGINEERING + OPSANDNOW INSTANTCATALOG LANEINSTANT PRICE · GUARANTEED DATEBOTH CONDITIONS REQUIRED, NOT EITHER
The published expansion rule for the Catalog envelope. It is a decision procedure, not a schedule: no dates are promised here, and no volume of requests moves the envelope on its own.

Change control

The envelope is versioned — ENV-1.0, ENV-1.1, and so on. It widens on two things together: enough real demand for a feature class, and a verification method that exists. Never because a salesperson promised something. Each revision is published here and the spec sheet above changes with it.

What this costs you

Nothing, and it is not a survey. Send the part you actually need; it gets quoted and made either way. The logging is on our side, on work we are already doing.

Why a real price can exist in minutes.

An instant price is not a pricing trick. It is what becomes available once the design space has already been engineered against. Three structural facts make the number real, then one bracket worked end to end.

01

Constrained scope

The envelope is the precondition for the price existing at all. Widen it without verification and you have a guess with a fast interface.

02

Central engineering

DFM, CAM, fixturing, probing and the inspection plan happen once, centrally, and ship as a Job Packet — spread across the network and across every future run of that packet.

03

Batching

Your part, someone else’s part, same material, same fixture family, one setup. The saving splits roughly three ways: a third to your price, a third to the shop, a third to us. We publish it because a split you cannot see is not one.

The batching mechanism — how parts from different customers share a stock buy and a fixture family — is drawn out in full on How It Works.

Worked exampleNote 2: why there is no dollar figure in this example2

BRACKET · 6061-T6 · 3.50 × 2.00 × 0.75 IN · QTY 10 · STANDARD CLASS · AS-MACHINED

What the envelope already fixes about it

The worked example measured against each published envelope constraint
ParameterThis partAgainst the envelope
Envelope check3.500 × 2.000 × 0.750"Inside the 12.000 × 8.000 × 4.000" box and above the 0.375 × 0.375 × 0.125" floor. Catalog lane.
Setups2 of 2Op1 takes the profile and the pockets; op2 flips it for the back face and the counterbores. At the limit, not over it — a third setup would route to Sourcing.
Stock6061-T6, 1.000" plate stepA 0.750" finished thickness is cut on both faces, so it comes off the ladder step above it, not off 0.750" stock.
Tolerance classStandard±0.005" linear, ±0.003" holes, 0.005"/in flatness. Nothing on the print asks for tighter, so it does not price as Precision.
Smallest internal radiusR0.125Four times the R0.031" floor, so no flag and no engineer disposition — the quote does not pause.
FinishAs-machined, 125 µin RaOn the fixed menu. No partner routing, so no added days to state.
Quantity10 pcsInside the 1–500 instant band. No engineered-quote wait.
Batching keys matched3 of 5Material plus ladder step, the standard soft-jaw family, and tolerance class. Tool-list overlap and date compatibility decide whether a batch actually forms.

Eight answers, none of them a judgement call, all of them readable off a model against a published spec. That is the whole reason a machine can price this and a network can promise a date for it. Nothing above required an estimator, and nothing above required you to fill in a form.

What is in the price the usual way

  • 01An estimator quotes it. The hours spent on quotes that never convert are recovered inside the ones that do.
  • 02A programmer writes the CAM. Hours, at that shop, for those ten parts.
  • 03Someone designs and cuts a fixture. For those ten parts.
  • 04Someone writes an inspection report from a blank template.
  • 05None of it transfers. The shop across town does the same work next week on a nearly identical bracket.

What is in the price here

  • 01Quoting is a computation against a verified envelope, not an estimator’s afternoon.
  • 02The engineering happens once and ships as a packet — reusable the moment the part runs again, anywhere in the network.
  • 03The shop is paid for what it actually does: setup, spindle time, probing, metrology.
  • 04Material comes off the shared stock ladder, so your ten pieces can ride one buy — and, when the keys match, one fixture load — with other customers’ parts.
  • 05Reorder the same packet and the engineering line is already spent. It does not come back.

On the reorder

A first run carries two kinds of line: the engineering that happens once, and the making that happens every time. Order the same bracket again and the packet is already released and already proven — the engineering lines are spent, and they are not charged twice. The making lines recur on every run, and they are the ones the batching split acts on.

Charged once — spent after run 1

  • DFM disposition
  • CAM and toolpath
  • The soft-jaw program
  • Probe routines
  • The inspection plan

Charged every run

  • Material off the ladder
  • Setup at the machine
  • Spindle time
  • Probing and inspection
  • Finish

So a reorder is instant at any prior quantity and carries loyalty pricing. That is not a discount invented for a marketing page — it is work we already did and are not going to bill you for again.

Note 22No dollar figure here, deliberately: a price depends on your model, quantity, tolerance class, finish and the stock ladder that week. A number printed here would be somebody else’s part. Upload yours and it is yours in minutes.

Five steps. You do two: send the part, and say yes.

No portal tour, no capability questionnaire, no “tell us about your project” form that ends in a phone call. Upload the part; the triage is ours.

01

Upload

A model, a quantity, and an email address. Add a print if your part carries callouts the model does not. This is the only step that needs your CAD.

02

Instant DFM and lane assignment

Automated DFM checks the geometry against the envelope and assigns the lane. If it lands in Sourcing we name the violating features in plain language — “the 0.020 inch internal corner radius in that pocket”, not “manufacturability concerns” — and offer a compliant redesign wherever one exists.

03

Price and date options

Catalog: a price with Standard and Rush date options, priced as different risks because they are. Sourcing: a human quote with a committed date, back inside two business days.

04

Order

You accept a price and a date. On the Catalog lane that date is a term of the order with automatic credits behind it — not a hope in an email thread.

05

Track

Status by real milestone: engineered, verified, routed, in-cut, inspected, shipped. Not a bar that fills because time passed. If a job reroutes to another machine you see the reroute and the date holds — rerouting is the feature working, so we show it rather than hide it.

Delivered

Parts, material certs, and the dimensional report from the packet’s inspection plan. FAI on request. Both lanes, every order, without asking.

One door. The triage is ours.

Send the model and the quantity. We will tell you which lane it runs in, what it costs, and when it ships — and if it lands outside the envelope, we will tell you exactly which feature put it there and what the alternative is. You are not expected to have read this page first.

For shops

Reading this because you own the machines rather than the part? Wrong page, right company. We send you the job, not the RFQ.

Apply as a Shop